Find Jobs
Hire Freelancers

CONSTRUCTION PROGRAMME OF WORKS FOR HOUSE RENOVATION/EXTENSION -- 2

$30-250 AUD

クローズ
投稿日: 2年以上前

$30-250 AUD

完了時にお支払い
CONSTRUCTION PROGRAMME OF WORKS FOR HOUSE RENOVATION/EXTENSION I NEED SOMEONE TO CREATE A PROGRAMME OF CONSTRUCTIONS WORKS AS PER THE PLAN ATTACHED ONLY EXPERIENCED CONSTRUCTION EXPERTS NEED APPLY
プロジェクト ID: 31923019

プロジェクトについて

8個の提案
リモートプロジェクト
アクティブ 2年前

お金を稼ぎたいですか?

Freelancerで入札する利点

予算と期間を設定してください
仕事で報酬を得る
提案をご説明ください
登録して仕事に入札するのは無料です
この仕事に8人のフリーランサーが、平均$171 AUDで入札しています
ユーザーアバター
hi there, i am an architect , i have 11 years of experience on house floor plan, foundation plan design with necessary measurement for construction, i have seen your attachment, i am able to do your house floor plan, foundation plan, elevation and 3d exterior design with landscaping very expertly
$50 AUD 3日以内
4.7 (72 レビュー)
5.2
5.2
ユーザーアバター
How ARA YOU? I am PMP-PMI-USA Certified, specialist at project management, expert in Scheduling with Primavera to create schedule and cash flow. I am a civil engineer, construction, class 2004, work as a project manager, PMP Certified, experience in Egypt, Emirates, and Saudi Arabia I Submit High-Quality work, On time. Meg me for Details. My management certificates( PMP, RMP, Primavera, FIDIC Contract, P3O). With my best regards, Eng. Elsayed Elgendy, Civil Engineer, PMP
$140 AUD 4日以内
4.9 (30 レビュー)
5.0
5.0
ユーザーアバター
Hi Sir, I will prepare primavera schedule and provide you with clear Tasks and timeline. I am Planner with18 years of experience. I have worked on several project. You can see an example of one of those projects in my portfolio. If you award me the project I'd be very happy to discuss this further and get started for you as soon as possible. Thanks Mohsin Raza
$190 AUD 7日以内
0.0 (0 レビュー)
0.0
0.0
ユーザーアバター
Highly experienced construction professional with experience in residential buildings in New York City. I can provide you with cost engineering, scheduling, and logistical planning. Please feel free to contact me directly if you need any assistance.
$140 AUD 4日以内
0.0 (0 レビュー)
0.0
0.0
ユーザーアバター
Hi, I am a Masters in construction management graduate, working in the construction industry for 2.5 years as an estimator (MELBOURNE). I work on project programmes and cost analysis on a daily basis. I am unable to open the drawings, and hence would like to confirm the price once I go through them. Thank you.
$175 AUD 5日以内
0.0 (0 レビュー)
0.0
0.0

クライアントについて

AUSTRALIAのフラグ
Brisbane, Australia
5.0
19
お支払い方法確認済み
メンバー登録日:8月 1, 2021

クライアント確認

ありがとうございます!無料クレジットを受け取るリンクをメールしました。
メールを送信中に問題が発生しました。もう一度お試しください。
登録ユーザー 投稿された仕事の合計
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
プレビューを読み込み中
位置情報へのアクセスが許可されました。
あなたのログインセッションの有効期限がきれ、ログアウトされました。もう一度ログインしてください。