Your urgent attention is required on this, we had already requested the cost pricing to modify the control panels previously supplied in order to have this working properly;
The system must be connected to GTC interface and the language is BacNet.
The control parameters will be:
-Check if the unit has power;
-Check if RAS pump is operational;
-Check if Ozone Generator is operational;
-Check outlet flow of the water treatment station;