Build a staff scheduling optimization model using an optimisation program.
R1750-5250 ZAR
クローズ
投稿日: 10年近く前
R1750-5250 ZAR
完了時にお支払い
The model has been developed however I do not have access to an optimisation programme and require a professional to build and solve the model in an optimization program (preferably LINGO).
Hello, I am m.s of systems engineering and b.s of industrial engineering and passed operation research courses, I worked on teacher assignment to class problem.