HV transmission line design projects

キャンセルされた 投稿 5年前 着払い
キャンセルされた 着払い

 Preparing the preliminary studies , site visits ,drawings , specifications , feasibility

,the estimated cost of the projects and Designing of High Voltage transmission lines

using PLS-CADD including project design criteria, plan and profile drawings, and

loading drawings, assembly drawings in the field of OHTL in big projects such as

I. Mostakbal city1 / Babr 220Kv OHTL interconnection (El Mostakbal Company

for Development and Urban in Egypt).

II. Relocation of 500 ,220 and 66Kv OHTL(El Mostakbal Company for

Development and Urban in Egypt).

III. Relocation of 500 ,220 and 66Kv OHTL( Madinet Nasr Company for Housing

and Development in Egypt ).

IV. Relocation of 66 and 11Kv OHTL(Upscale Borj Al Arab in Egypt).

V. Mirama / Nsongezi 132Kv OHTL(UETCL in Uganda).

VI. Bulyanhulu / Geita 220Kv OHTL (TANESCO in Tanzania).

エンジニアリング

プロジェクトID: #17936436

プロジェクトについて

リモートプロジェクト アクティブ 5年前