Creating Mechanical/Air Conditioning Equipement Schedules

終了済み 投稿 Feb 23, 2015 着払い
終了済み 着払い

Review mechanical (sometimes architectural) plans for high rise buildings, on a per floor basis. Mark up the floor plan in pdf editor and put together an excel spreadsheet summarizing counts and ac equipment orientations. Equipment type on floor plans is always tagged and labeled. Total counts, summary of unit hangings and room tags are missing however, need this info summarized line by line in an excel sheet.

Projects will entail approximately 10 or more floor plans to be reviewed at a time. Simple work, requires attention to detail and common sense to recognized obvious interference/mistakes in the plans. Looking for longer term partnership.

空調 建設モニタリング データ入力 機械工学

プロジェクトID: #7195543

プロジェクトについて

1個の提案 リモートプロジェクト アクティブ Apr 2, 2015

1人のフリーランサーが、このジョブに平均$115で入札しています

WordSmith365

Hi, I have been a freelancer for a few years. Along with a writer i have experience in data entry planet. I am a hard worker who meets all deadlines and produces quality work in a timely manner. I am a fast learne もっと

$115 CAD 3日以内
(0件のレビュー)
0.0