[login to view URL] shall evaluate the existing DCS system and shall check the feasibility of
new I/O(s) into Existing DCS and will prepare the Conceptual Design Leading to
Detail Design after review & Approval from the customer.
2. Freelancer shall Develop, Configure and integrate the new interlocks as per
the control narrative and requirement of this project.
3. Freelancer shall accommodate new serial signals into DCS stated in Table.
4. Freelancer shall update Modbus mapping list and establish ESD to DSC tags
communication through existing Modbus communication.
5. Configuration, Commissioning and Development/Modification, Integration and
mapping as per provided P&ID of new instruments with Graphics Display, Trend
Pages, Tuning Panel, Soft tags, Min-Max Alarms, Logging & Annunciation
/Status) e.g. including Continuous Process parameters Measurements/ Process
Control.
6. Min / Max Alarms and data logging /Status arrangements.
7. freelancer shall check the operability and viability to use these suggested spares or
otherwise course will be adopted by customer.
[login to view URL] shall closely follow the Process & Operation instruction as
per their requirements.