I have many experiences with MOSES and we can chat. For example:
Development of a Macro based on MOSES to analysis and produce Excel results for all mooring lines and automatically doing damage, transient and fatigue analyzes for different water depth, environment direction and wave period! Normally for analysis of each mooring pattern 2 weeks engineering work is required. But after using this macro in Leighton Offshore, producing each report just took maximum 3 days. Also, development of another Macro to calculate crane load charts based on General method or Vessel specific method of API-2C 2012 including motion analysis for different wave heights and condition.