Update to current Job Maintanence System
$30-90 USD
着払い
I have a current program that requires 2 x new reports (data to be pulled from current DB) 2 x graphs (data to be pulled from same reports and displayed in either bar/pie/line charts) I am familiar with using MS Chart Control to achieve this graph result. The reports are very basic. (please read the XCEL file provided for examples) I will provide you with source code of current system that is to be modified OR provide separate exe's that may launch through this same program ! I require coding to be written using simple language yet using advanced techniques. (I will send my program as an example) ------------ 19 Aug 2003 ------------- Please not this is not a XCEL project these are merely examples. The additions are to be built in Visual Basic, possible using the report writer and the chart control !!!
## Deliverables
1) Complete and fully-functional working program(s) in executable form as well as complete source code of all work done. 2) Installation package that will install the software (in ready-to-run condition) on the platform(s) specified in this bid request. 3) Complete ownership and distribution copyrights to all work purchased.
## Platform
VB6 to run on Win XP, Win 2000, Win 98
プロジェクトID: #2963068