仕事が見つかりません

申し訳ありませんが、お探しの仕事が見つかりませんでした。

最新の仕事をこちらで見つけてください:

I need a new website. I need you to design and build a website for my small business. We manufacture Vermicompost (organic fertilizer). We have a few products which we want showcase on our website. There will be information about the procedure followed to manufacture Vermicompost.

$22 - $184
$22 - $184
0 入札

Need a Hadoop Developer who has 4-5 year and can teach Hadoop within 3 to 4 days

$184 - $553
$184 - $553
0 入札

We are looking for a developer who can develop an end-to-end POS project. If you have the skills as a web developer and also possesses good design skills, then we are looking for you! Our idea is to have the following requirements: (note that this is just an overview). When you bid, IT IS IMPORTANT THAT YOU GIVE US AN IDEA OF HOW YOU WILL BE DEVELOPING THIS. * Can support multiple langu...

$1277 (Avg Bid)
$1277 \u5e73\u5747\u5165\u672d\u984d
5 入札

Design of the main pages + unique design of each product page 10 products Types of pages for design: • Main page • Catalog page • Product page (unique design of each product page – 10 pages) • Page of services • Service page • Contacts page • Blog page • Content page (template of typical content page) You do only the design part not developement ot C...

$376 (Avg Bid)
$376 \u5e73\u5747\u5165\u672d\u984d
19 入札

I would like to write a general research paper, heavily backed by data, on blockchain and its disruptions. with 2/3 case studies. 15-20 pages, 1.5 space, font 12. please give me your quote

$490 (Avg Bid)
$490 \u5e73\u5747\u5165\u672d\u984d
11 入札

I am looking for student who can support me and who is based in Europe.(age 18~29) This is part time job but for long term. conversational english and good communication need monthly budget $50 I will provide more details via chat or interview.

$116 (Avg Bid)
$116 \u5e73\u5747\u5165\u672d\u984d
4 入札
New Brand Logo 6 日 left
認証完了

Looking to make new brand logo..the brand its dedicated to Electronic engineering.. This logo need to have circular logo and brand name, need to have different sizes like: 40x40 ,16x16, etc... and different colours.. Need to have too in different files only the logo and other the brand name with different sizes too. Please send your portafolio expamples. Regards

$18 / hr (Avg Bid)
$18 / hr \u5e73\u5747\u5165\u672d\u984d
21 入札

Hi! I am looking to change my logo colors. If someone is able to take my logo and make a new logo portfolio for me that would be great. New logo color: purple- see attachments. I need: PNG files of: - all purple lettering and logo - all white lettering and logo - purple logo with white lettering - Purple hands on the logo with white 'stripes' in between, white lettering - One pur...

$54 (Avg Bid)
$54 \u5e73\u5747\u5165\u672d\u984d
38 入札

Animation of flexible shaft, we need to describe animation of cleaner under a strap commode member

$22 (Avg Bid)
$22 \u5e73\u5747\u5165\u672d\u984d
2 入札
Build a website template 6 日 left
認証完了

I need a website template. I have a programer who will fill in the content. Its for a sports handicapper site. Please DO NOT reply if you have have no experience or examples of this kind of site. I need it ASAP!

$165 (Avg Bid)
$165 \u5e73\u5747\u5165\u672d\u984d
20 入札